Media Release

US Navy Orders Material For Additional Austal JHSVs

22 June 2009

Computer render of Austal's 103-metre Joint High Speed Vessel
The US Navy has exercised contract options funding Austal’s acquisition of long lead-time material associated with the construction of two additional 103-metre Joint High Speed Vessels (JHSV).

Austal was awarded the initial contract to design and build the first 103 metre JHSV in November 2008. The contract included options for nine additional vessels to be awarded between FY09 and FY13.

Each JHSV is valued at approximately AUD $225 million, with the potential 10-vessel program valued at approximately AUD $2.3 billion.

Austal USA President and COO, Joe Rella said, “Due to on-time performance and high quality results during our design reviews with the Navy, and the efficiency of our material procurement to date, we have earned the confidence of the Navy to make this award. This is a testament to the quality products of our Program, Design, Production Control and Procurement teams.”

Long lead-time material for the additional vessels will include diesel engines, water jets and reduction gears.

Similar to the Austal-built “WestPac Express” operated by the US Marines for the past seven years, the JHSV will be capable of transporting troops and their equipment, supporting humanitarian relief efforts, operating in shallow waters and reaching speeds in excess of 35 knots fully loaded. The vessels will be a joint-use platform operated by both the United States Army and Navy.

Construction of the first JHSV is scheduled to commence at Austal’s US shipyard in November.


For further information on this delivery click here.

To download high resolution images to accompany this release click here.


Contact:Austal
Phone:61 8 9410 1111
Fax:61 8 9410 2564
Email:pubrel@austal.com